Generally, when the molded product is taken out of the mold, whether it is a single or multi-element ejection mechanism, all ejection actions are completed at one time.
However, when the product has a special shape or mass production, if the molded product is still in the mold cavity after one ejection, or cannot fall off automatically, then a secondary ejection mechanism is needed to achieve demolding.